AENL Amszterdam

Checking the demolition of an existing hall and determining the demolition sequence. Closure of the existing and the remaining building with a steel wall, and design of a new steel hall for the demolished part of the building, both on structural and design level, using cca. 1500 tonnes of steel on a floor area of 7000 square metres.